The regular meeting of the Barry County Road Commission was called to order at 5:00 P.M. by Chairman Willcutt.
Members present: Willcutt, Fiala, Dykstra and Managing Director Bradley Lamberg.
The agenda for April 29, 2008 was approved after item 12 was moved down to just before unfinished business.
______________________________________________________________________________
The minutes of April 15, 2008 were approved as read by the Secretary.
______________________________________________________________________________
Motion was made and seconded to approve payroll for payment.
ROLL CALL: Yeas, Willcutt, Dykstra, & Fiala
Nays, None
Motion Carried
CHECK NAME AMOUNT
Barry County Road Commission $73,079.01
______________________________________________________________________________
Motion was made and seconded to approve the bills for payment.
ROLL CALL: Yeas, Willcutt, Dykstra, & Fiala
Nays, None
Motion Carried
Check Name Amount
| 22859 | AIS CONST EQUIP CORP |
217.40 |
||||||||
| 22860 | REGIONS INTERSTATE BILLING SERVICE |
1,294.84 |
||||||||
| 22861 | ALLTEL |
108.70 |
||||||||
| 22862 | ALRO STEEL CORPORATION |
937.87 |
||||||||
| 22863 | AMERICAN MESSAGING |
12.82 |
||||||||
| 22864 | ASR CORPORATION |
90.00 |
||||||||
| 22865 | BARRY COUNTY LUMBER |
222.00 |
||||||||
| 22866 | BEN’S TECH SUPPLY |
88.26 |
||||||||
| 22867 | BESCO WATER TREATMENT INC |
29.50 |
||||||||
| 22868 | BLUE CARE NETWORK |
15,152.68 |
||||||||
| 22869 | COGITATE INC |
110.00 |
||||||||
| 22870 | CONSUMERS ENERGY |
6,271.55 |
||||||||
| 22871 | CUMMINS BRIDGEWAY LLC |
463.23 |
||||||||
| 22872 | DIESEL INJECTION SERVICE LLC |
356.19 |
||||||||
| 22873 | ELECTRICAL TERMINAL SERVICE INC |
95.42 |
||||||||
| 22874 | FIDELITY INVESTMENTS |
5,848.42 |
||||||||
| 22875 | FRANK M FIALA |
304.45 |
||||||||
| 22876 | GUARDIAN ALARM COMPANY |
24.64 |
||||||||
| 22877 | HASTINGS ACE HARDWARE |
80.91 |
||||||||
| 22878 | HEATHER SMITH |
75.75 |
||||||||
| 22879 | HELP NET |
324.00 |
||||||||
| 22880 | IMSA |
60.00 |
||||||||
| 22881 | JERRYS TIRE SERVICE |
166.00 |
||||||||
| 22882 | KIMBALL MIDWEST |
330.01 |
||||||||
| 22883 | LAWSON PRODUCTS, INC |
371.54 |
||||||||
| 22884 | MCRCSIP |
201,722.00 |
||||||||
| 22885 | MICHIGAN CAT |
1,659.09 |
||||||||
| 22886 | MIKA, MEYERS, BECKETT & JONES |
10,024.31 |
||||||||
| 22887 | MODEL COVERALL SERVICE |
52.54 |
||||||||
| 22888 | NAPA AUTO PARTS |
786.55 |
||||||||
| 22889 | NEAL’S TRUCK PARTS |
54.12 |
||||||||
| 22890 | NEXTEL COMMUNICATIONS |
532.06 |
||||||||
| 22891 | ONE COMMUNICATIONS |
154.04 |
||||||||
| 22892 | OSCAR W LARSON COMPANY |
149.80 |
||||||||
| 22893 | POWERNET GLOBAL COMMUNICATIONS |
25.44 |
||||||||
| 22894 | PROFESSIONAL BENEFITS SERVICES |
1,323.00 |
||||||||
| 22895 | PURITY CYLINDER GASES INC |
769.56 |
||||||||
| 22896 | QUILL CORPORATION |
347.41 |
||||||||
|
Check |
Name |
Amount |
||||||||
| 22897 | RADIO COMMUNICATIONS INC. |
451.45 |
||||||||
| 22898 | ROAD EQUIPMENT PARTS |
810.50 |
||||||||
| 22899 | ROBERT RICHARDSON |
168.45 |
||||||||
| 22900 | SANISWEEP INC |
520.00 |
||||||||
| 22901 | SCOTT CIVIL ENGINEERING COMPANY |
760.00 |
||||||||
| 22902 | SHELL CREDIT CARD CENTER |
17.70 |
||||||||
| 22903 | STANDARD INSURANCE CO. |
413.52 |
||||||||
| 22904 | STATE OF MICHIGAN |
277.05 |
||||||||
| 22905 | STATE OF MICHIGAN |
7,682.36 |
||||||||
| 22906 | TRUCK & TRAILER SPECIALTIES |
8,426.56 |
||||||||
| 22907 | USPS-HASLER |
250.00 |
||||||||
| 22908 | VESCO OIL CORPORATION |
2,549.33 |
||||||||
| 22909 | WILLIAM JOHNSTON |
31.94 |
||||||||
| 22910 | WILCOX PROFESSIONAL SERVICES LLC |
11,607.67 |
||||||||
| 22911 | WYOMING ASPHALT PAVING CO |
12,709.27 |
||||||||
| Checks Listed |
297,311.90 |
|||||||||
___________________________________________________________________________
Material bids were opened on April 22, 2008 at 10:00 A.M. Bids were tabulated and presented to the Board.
Natural Aggregate for Sealcoat Bid Tabulation
|
Natural Aggregate 17 Series |
||||||
|
|
|
|
|
|
|
|
| Bidder |
Crushed |
Soft Particles |
Loss by Wash |
At Stockpile |
Delivered to Doster Pit |
|
|
|
|
|
|
|
|
|
| Battle Creek Gravel |
95.0% |
No #% |
1.50% |
9.98 |
13.78 |
|
| Yellow Rose Transport | 95.0% | 1.00% | 1.00% | No Bid | 15.25 |
|
| Verplank Trucking Company |
95.0% |
1-2% |
1.00% |
No Bid |
16.55 |
|
| Aggregate Industries |
No Bid |
No Bid |
No Bid |
No Bid |
No Bid |
|
| Stoneco | Alternate Bid | |||||
|
Natural Aggregate 31A for Seal Coat |
||||||
|
|
|
|
|
|
|
|
| Bidder |
Crushed |
Soft Particles |
Loss by Wash |
At Stockpile |
Hastings Pit |
Drake Pit |
|
|
|
|
|
|
|
|
| Battle Creek Gravel | 80-85% |
No #% |
1.00% |
8.75 |
12.93 |
11.85 |
| Yellow Rose Transport | 95.00% | 1.00% | 1.00% | No Bid | 13.75 | 15.25 |
| Verplank Trucking Company |
100.0% |
0.60% |
1.10% |
No Bid |
12.30 |
12.90 |
| Aggregate Industries |
96.00% |
3.90% |
2.90% |
14.70 |
18.50 |
18.00 |
| Stoneco | Alternate Bid |
|
|
|
|
|
Motion was made and seconded to award the 17 Series Natural Aggregate to Battle Creek Gravel & 31A Natural Aggregate to Verplank Trucking.
ROLL CALL: Yeas, Willcutt, Dykstra, & Fiala
Nays, None
Motion Carried
25A Slag and 29A Slag
|
Pit #1 |
Pit #2 |
Pit #3 |
Pit #4 |
Pit #5 |
|
| Bidder |
Hastings |
Drake |
Bender |
Doster |
HSV |
|
|
|
|
|
|
|
| Kenneth Smith Inc. |
$22.75 |
$22.75 |
$22.75 |
$22.25 |
$23.50 |
| 29A Slag |
No Bid |
No Bid |
No Bid |
No Bid |
No Bid |
|
|
|
|
|
|
|
| Yellow Rose Transport |
$21.20 |
$21.80 |
$20.30 |
$21.80 |
$20.90 |
| 29A Slag |
No Bid |
No Bid |
No Bid |
No Bid |
No Bid |
|
|
|
|
|
|
|
| Verplank Trucking Company |
$19.87 |
$20.82 |
$19.17 |
$20.07 |
$19.57 |
| 29A Slag |
No Bid |
No Bid |
No Bid |
No Bid |
No Bid |
|
|
|
|
|
|
|
| Brewer City Dock |
$21.10 |
$22.35 |
$20.60 |
$22.35 |
$21.80 |
| 29 A Slag |
No Bid |
No Bid |
No Bid |
No Bid |
No Bid |
Motion was made and seconded to award the 25A Slag bid to Verplank Trucking Company.
ROLL CALL: Yeas, Willcutt, Dykstra, & Fiala
Nays, None
Motion Carried
______________________________________________________________________________
Asphalt Paving
|
Bid Items |
|
Aggregate Industries Kalamazoo, MI |
|
Affordable Asphalt Middleville, MI |
|
Lakeland Asphalt Corp. Battle Creek, MI |
|
Michigan Paving & Materials Company Kalamazoo, MI |
|
|
||||||||
|
Bit Mix 4 C |
|
$65.00 |
|
$53.00 |
|
$56.50 |
|
$56.00 |
|
Bit Mix 13 A |
|
$64.47 |
|
$53.00 |
|
$56.50 |
|
$51.45 |
|
Bit Mix 36 A |
|
$64.47 |
|
$53.00 |
|
$56.50 |
|
$52.50 |
|
Bit App |
|
$68.47 |
|
$85.00 |
|
$60.00 |
|
$64.00 |
|
Lighted Arrow |
|
$500.00 |
|
$475.00 |
|
$495.00 |
|
$150.00 |
|
|
|
|
|
|
|
|
|
|
|
Total Amount |
|
$844,140.00 |
|
$722,425.00 |
|
$739,485.00 |
|
$696,900.00 |
Motion was made and seconded to award the Asphalt Paving bid to Michigan Paving & Materials as first option and Affordable Asphalt as second option.
ROLL CALL: Yeas, Willcutt, Dykstra, & Fiala
Nays, None
Motion Carried
CULVERTS
|
Galvanized |
|
|
Aluminized |
|
|
|
|
Culverts |
Contech Construction Products West Bloomfield, MI
|
Jensen Bridge & Supply Co. Sandusky, MI | St. Regis Culvert, Inc. Charlotte, MI
|
Contech Construction Products West Bloomfield, MI
|
Jensen Bridge & Supply Co. Sandusky, MI
|
St. Regis Culvert, Inc. Charlotte, MI |
|
|
|
|
|
|||
| 12″ Culvert |
$5.25 |
$5.84 |
$5.56 |
$5.95 |
$5.90 |
$6.38 |
| 12″ Band x 12″ |
$8.00 |
$11.68 |
$8.40 |
$10.00 |
$11.80 |
$9.60 |
|
|
|
|
|
|
||
| 15″ Culvert |
$6.35 |
$7.03 |
$6.80 |
$7.20 |
$7.20 |
$7.66 |
| 15″ Band x 12″ |
$9.75 |
$14.07 |
$10.20 |
$15.00 |
$14.40 |
$11.50 |
|
|
|
|
|
|
||
| 18″ Culvert |
$8.35 |
$8.67 |
$9.00 |
$9.00 |
$8.60 |
$9.60 |
| 18″ Band x 24″ |
$17.00 |
$17.35 |
$18.00 |
$18.00 |
$17.20 |
$19.20 |
|
|
|
|
|
|
||
| 24″ Culvert |
$14.00 |
$14.69 |
$14.64 |
$16.00 |
$16.03 |
$15.32 |
| 24″ Band x 24″ |
$28.00 |
$29.38 |
$29.28 |
$32.00 |
$32.06 |
$30.64 |
|
|
|
|
|
|
||
| 30″ Culvert |
$17.35 |
$19.54 |
$18.30 |
$20.00 |
$19.96 |
$19.20 |
| 30″ Band x 24″ |
$35.00 |
$39.08 |
$36.60 |
$40.00 |
$39.92 |
$38.40 |
|
|
|
|
|
|
||
| 36″ Culvert |
$21.45 |
$22.67 |
$21.96 |
$24.00 |
$23.88 |
$22.98 |
| 36″ Band x 24″ |
$42.00 |
$45.34 |
$43.94 |
$48.00 |
$47.76 |
$45.96 |
|
|
|
|
|
|
||
| 48″ Culvert |
$39.20 |
$42.42 |
$41.60 |
$45.00 |
$45.43 |
$42.90 |
| 48″ Band x 24″ |
$78.00 |
$84.84 |
$83.20 |
$90.00 |
$90.86 |
$85.80 |
|
|
|
|
|
|
||
| 60″ Culvert |
$50.00 |
$60.10 |
$52.00 |
$70.00 |
$70.77 |
$57.50 |
| 60″ Band x 24″ |
$100.00 |
$120.19 |
$104.00 |
$140.00 |
$141.54 |
$115.00 |
|
|
|
|
|
|
||
| 72″ Culvert |
$86.00 |
$95.40 |
$79.00 |
$90.00 |
$95.12 |
$87.40 |
| 72″ Band x 48″ |
$172.00 |
$190.81 |
$158.00 |
$180.00 |
$190.25 |
$174.80 |
|
|
|
|
|
|
||
| 84″ Culvert |
$104.00 |
$108.86 |
$122.85 |
$110.00 |
$110.85 |
NA |
| 84″ Band x 48″ |
$208.00 |
$217.71 |
$245.70 |
$220.00 |
$221.70 |
NA |
|
Total |
|
|
|
|
|
|
| Terms |
Net |
Net |
Net |
Net |
Net |
Net |
|
30 Days |
30 Days |
30 Days |
30 Days |
30 Days |
30 Days |
|
|
Prices |
1% |
Prices |
Prices |
1% |
Prices |
|
|
firm only |
10 days |
firm only |
firm only |
10 days |
firm only |
|
|
120 days |
Prices |
90 days |
120 days |
Prices |
90 days |
|
|
Svc. Charge |
firm only |
|
Svc. Charge |
firm only |
||
|
Orders >$1000 |
60 days |
|
Orders >$1000 |
60 days |
||
|
$125.00 Chg |
|
|
$125.00 Chg |
|
||
|
Orders >$500 |
|
|
Orders >$500 |
|
||
|
$150.00 Chg |
|
|
$150.00 Chg |
|
||
|
|
5% Disc. |
|
|
5% Disc. |
||
|
|
for Plant |
|
|
for Plant |
||
|
Pickup |
|
|
Pickup |
|
Culverts Continued
|
Poly Coated |
|
Plastic |
|
||
|
Culverts |
Jensen Bridge & Supply Company Sandusky, MI (Quote Polymer Coated) |
St. Regis Culvert, Inc. Charlotte, MI |
Contech Construction West Bloomfield, MI (Quote- Asphalt Coated)
|
Advanced Drainage Systems, Middleville, MI
|
Contech Construction West Bloomfield, MI
|
|
|
|
|
|
||
| 12″ Culvert |
$9.12 |
$10.00 |
$8.50 |
$3.61 |
$4.30 |
| 12″ Band x 12″ |
$18.24 |
$15.00 |
$17.00 |
$3.61 |
$7.00 |
|
|
|
|
|
|
|
| 15″ Culvert |
$11.26 |
$12.00 |
$10.50 |
$5.15 |
$6.00 |
| 15″ Band x 12″ |
$22.53 |
$18.00 |
$21.00 |
$5.15 |
$11.00 |
|
|
|
|
|
|
|
| 18″ Culvert |
$13.32 |
$15.00 |
$13.00 |
$7.61 |
$8.50 |
| 18″ Band x 24″ |
$26.64 |
$30.00 |
$26.00 |
$7.61 |
$17.00 |
|
|
|
|
|
|
|
| 24″ Culvert |
$20.93 |
$24.00 |
$22.00 |
$12.04 |
$13.00 |
| 24″ Band x 24″ |
$41.87 |
$48.00 |
$44.00 |
$12.04 |
$32.00 |
|
|
|
|
|
|
|
| 30″ Culvert |
$26.76 |
$30.00 |
$25.00 |
$19.00 |
$22.00 |
| 30″ Band x 24″ |
$53.53 |
$60.00 |
$50.00 |
$19.00 |
$74.00 |
|
|
|
|
|
|
|
| 36″ Culvert |
$32.19 |
$36.00 |
$35.00 |
$23.00 |
$26.00 |
| 36″ Band x 24″ |
$64.37 |
$72.00 |
$70.00 |
$23.00 |
$80.00 |
|
|
|
|
|
|
|
| 48″ Culvert |
$58.87 |
$65.00 |
$60.00 |
$39.00 |
NA |
| 48″ Band x 24″ |
$117.74 |
$130.00 |
$120.00 |
$39.00 |
NA |
|
|
|
|
|
|
|
| 60″ Culvert |
$80.18 |
$81.00 |
$85.00 |
$61.00 |
NA |
| 60″ Band x 24″ |
$160.36 |
$162.00 |
$170.00 |
$61.00 |
NA |
|
|
|
|
|
|
|
| 72″ Culvert |
$128.33 |
$123.00 |
$175.00 |
NA |
NA |
| 72″ Band x 48″ |
$256.65 |
$246.00 |
$350.00 |
NA |
NA |
|
|
|
|
|
|
|
| 84″ Culvert |
$144.82 |
$173.00 |
$250.00 |
NA |
NA |
| 84″ Band x 48″ |
$288.53 |
$346.00 |
$500.00 |
NA |
NA |
|
|
|
|
|
||
| Terms |
Net |
Net |
Net |
|
Net |
|
30 Days |
30 Days |
30 Days |
|
30 Days |
|
|
1% |
Prices |
Prices |
|
Prices |
|
|
10 Days |
firm only |
firm only |
|
firm only |
|
|
Prices |
90 days |
120 days |
|
120 days |
|
|
firm only |
|
Svc. Charge |
|
Svc. Charge |
|
|
60 days |
|
Orders >$1000 |
|
Orders >$1000 |
|
|
|
|
$125.00 Chg |
|
$125.00 Chg |
|
|
|
|
Orders >$500 |
|
Orders >$500 |
|
|
|
|
$150.00 Chg |
|
$150.00 Chg |
|
|
|
|
5% Disc. |
|
5% Disc. |
|
|
|
|
for Plant |
|
for Plant |
|
|
|
|
Pickup |
|
Pickup |
Motion was made and seconded to award the Corrugated Metal Culverts to St. Regis Culvert Company and the Smooth Lined Plastic Culverts to Advanced Drainage Systems, Inc.
ROLL CALL: Yeas, Willcutt, Dykstra, & Fiala
Nays, None
Motion Carried
______________________________________________________________________________
Traffic Control Signs
|
|
|
|
|
| Signs | Dornbos Sign and Safety, Inc. Charlotte, Michigan
|
Rathco Safety Supply Portage, MI | Vulcan Signs Foley, AL |
|
|
|
|
|
| 30″ Stop |
$24.39 |
$26.95 |
$26.48 |
| 36″ Stop |
$35.14 |
$39.92 |
$38.01 |
| 36″ Yield |
$18.67 |
$20.17 |
$17.20 |
| 24″x30″ Speed Limit |
$22.46 |
$23.44 |
$23.00 |
| 12″x18″ No Parking |
$7.43 |
$7.39 |
$7.12 |
| 24″x24″ No Park-Symbol |
$22.57 |
$18.74 |
$18.83 |
| 48″x30″ Road Closed |
$45.00 |
$46.45 |
$46.00 |
| 30″ Warning |
$30.66 |
$29.27 |
$28.75 |
| 36″ Warning |
$40.40 |
$42.18 |
$41.40 |
| 48″x24″ Target Arrow |
$39.34 |
$37.49 |
$36.80 |
| 18″x24″ Chevron |
$14.73 |
$14.07 |
$13.80 |
| 30″ Stop Ahead-Symbol |
$34.33 |
$31.84 |
$30.07 |
| 36″ Stop Ahead-Symbol |
$49.34 |
$45.94 |
$42.70 |
| 18″ Advisory Speed |
$11.07 |
$10.53 |
$10.62 |
| 6″x24″ Road Name Blank |
$7.30E/G/$9.55 HIP |
$10.64 |
$8.94 |
|
|
|
|
|
|
Prices Firm 1 Year |
|
Shipping |
|
|
|
|
Stock Items |
|
|
|
|
3-5 Days |
|
|
|
|
Non-Stock |
|
|
|
|
30-45 Days |
Motion was made and seconded to award the Traffic Control Sign bid to Dornbos Sign and Safety, Inc.
ROLL CALL: Yeas, Willcutt, Dykstra, & Fiala
Nays, None
Motion Carried
Bituminous Mixtures
|
Picked up at Bidders Plant |
|||||
|
|
|
|
|
|
|
|
Bituminous Mixtures |
Lakeland Asphalt Corp Battle Creek, MI
|
Michigan Paving & Materials
|
Wyoming Asphalt and Paving Company, Inc. Plainwell, MI
|
Aggregate Industries Kalamazoo, MI
|
|
|
13A |
$42.00 |
$41.00 |
$46.24 |
$45.30 |
|
|
36A |
$42.00 |
$42.00 |
$45.83 |
$45.30 |
|
|
|
|
|
|
|
|
|
3C |
$43.00 |
$43.00 |
$51.75 |
$45.77 |
|
|
4C |
$44.00 |
$43.00 |
$50.34 |
$45.77 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Delivery by Quadrants | |||||
|
|
|
|
|
|
|
|
N W |
No Bid |
$7.50 |
No Bid |
No Bid |
|
|
N E |
No Bid |
$8.50 |
No Bid |
No Bid |
|
|
S W |
No Bid |
$5.50 |
No Bid |
No Bid |
|
|
S E |
No Bid |
$5.50 |
No Bid |
No Bid |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Terms |
|
|
Net 30 Days |
|
|
Motion was made and seconded to award the Bituminous Mixture bid to all suppliers and be purchased in the best interest of the Barry County Road Commission.
ROLL CALL: Yeas, Willcutt, Dykstra, & Fiala
Nays, None
Motion Carried
______________________________________________________________________________
Motion was made and seconded to authorize Chairman Willcutt to sign the Compromise and Settlement Agreement for the lawsuit Barry County Road Commission vs Raschenburger, Hilliker, and Otto.
ROLL CALL: Yeas, Willcutt, Dykstra, & Fiala
Nays, None
Motion Carried
______________________________________________________________________________
Motion was made and seconded to approve the work on the gate at McKeown Bridge Park per the Barry County request.
ROLL CALL: Yeas, Willcutt, Dykstra, & Fiala
Nays, None
Motion Carried
Motion was made and seconded to accept Resolution from Castleton Township.
ROLL CALL: Yeas, Willcutt, Dykstra, & Fiala
Nays, None
Motion Carried
At the April 16, 2008 regular township board meeting the following list of work was approved.
2008 East State Road Project $30,400
Full Seal 2.02 mile Wellman Road (State Road North to Coats Grove Road) $23,230
26% Chloride application. (4.32 mile One Pass, 28.94 Full width) $10,486
Road Gravel $ 6,000
Line Painting as recommended $ 1,223
Total $71,339
Due to lack of extra funds and with payments still due on East State Road this is the best we feel the township is able to afford.
______________________________________________________________________________
Motion was made and seconded to accept Resolution from Thornapple Township.
ROLL CALL: Yeas, Willcutt, Dykstra, & Fiala
Nays, None
Motion Carried
Thornapple Township Road Program for 2008-09
Bender Road
0.75 Mile – Adams to Village Limits
Blade Patch & Seal (400 tons) $28,225
Bender Road
- 1.0 Mile – Green Lake Road to Finkbeiner Road
Blade Patch & Seal (500 tons) $36,000
Dust Control
26% Solution – Two Passes, full width $14,300
New Gravel
Not to exceed $13,000
Pavement Marking
From BCRC schedule furnished $ 2,127
Total $93,652
______________________________________________________________________________
Motion was made and seconded to accept Resolution from Johnstown Township.
ROLL CALL: Yeas, Willcutt, Dykstra, & Fiala
Nays, None
Motion Carried
The Johnstown Township Board has approved the following road work for 2008.
Full Seal for Hickory Road from M-37 to Hutchinson Road
Full Seal for Jones Road from Hickory Road to Mill Lake Road
Full Seal for Baseline Road from Waubascon Road East to Township Line
Full Seal for Banfield Road from Hobbs Road to Pifer Road.
Johnstown Township Resolution Continued.
Two applications of Dust Control the same as 2007.
Gravel in the amount of $10,000.00 to be placed at your discretion.
Center Line Painting for the following roads
Bristol Road from Banfield Road to M-37
Hobbs & Mill Lake Road from M-37 to Banfield
Hutchinson Road from Fruin Road to Baseline Road
Leinaar Road from Banfield Road to Manning Lake Road
Jones Road from Hickory Road to Mill Lake Road
Strickland Road from Hutchinson Road to Waubascon Road
Waubascon Road from Baseline Road to Mud Lake Road.
______________________________________________________________________________
Meeting adjourned at 7:10 P.M.
_________________________________ __________________________________
Chairman Secretary