April 12, 2018

 

 

The regular meeting of the Barry County Road Commission was called to order at the Road Commission’s Board Room at 7:30 A.M. by Chairman Solmes.

 

Members present: Solmes, Fiala, Dykstra, and Managing Director Bradley Lamberg.

 

The agenda for April 12, 2018 was approved.

 

The minutes of March 22, 2018 were approved as printed.

______________________________________________________________________________

 

Motion was made and seconded to approve payroll for payment.

 

ROLL CALL: Yeas, Solmes, Fiala, & Dykstra

Nays, None

Motion Carried

 

CHECK            NAME                                                                           AMOUNT

3/22/18              Barry County Road Commission                                   $93,091.62

4/5/18                Barry County Road Commission                                 $89,760.14

 

______________________________________________________________________________

 

Motion was made and seconded to approve the bills for payment.

 

ROLL CALL: Yeas, Solmes, Fiala, & Dykstra

Nays, None

Motion Carried

 

3/22/18

Check Number Vendor Name Check Amount
38340 Adam Nieland $100.00
38341 Advantage Plumbing & Drain LLC $637.50
38342 Barbara Sue Hanneman $300.00
38343 Barry County Payroll Account $35.70
38344 Blue Care Network $18,427.97
38345 C Stoddard & Sons Inc. $150.00
38348 Capital One Bank $44,746.92
38349 Consumers Energy $11,202.40
38350 Culligan Water Conditioning $35.35
38351 F.D. Lake Company $249.75
38352 Frontline Maintenance & Serv. $14,050.00
38353 Hammersmith Equipment Company $126.00
38354 Hastings Ace Hardware $14.49
38355 IRS – Taxes $137.70
38356 Judy Lancaster $25.00
38357 L & S Service $3,984.08
38358 Lakeland Asphalt Corp $706.50
38359 Lincoln National Life Ins $170.04
38360 Michelle Kappen $50.00
38361 Morgan Electrical Services Inc $40,125.00
38362 Neopost USA Inc. $571.67
38363 Pressure Connections Corp $37.71
38364 Spectrum Health – Pennock $168.32
38365 Spotless Auto Lube & Wash $10.00
38366 State Of Michigan $56,774.42
38367 State Wire & Terminal $282.35
     
     
Check Number Vendor Name Check Amount
38368 Unum $314.65
38369 Varipro Benefit Administrators $843.00
38370 Weller Truck Parts $1.97
Sub-Total $194,278.49
04/05/2018
Check Number Vendor Name Check Amount
38371 Barbara Sue Hanneman $300.00
38372 Bert Keeler $380.00
38373 Brad Lamberg $80.00
38374 Brandy Casey $80.00
38375 Brian Doninni $30.00
38376 C & N Supply $39.00
38379 Capital One Bank $22,030.73
38380 Charles Benedict $552.54
38381 Chris BeBeau $80.00
38382 Chris BeBeau BCRC $149.79
38383 City Of Hastings $1,026.70
38384 Consumers Energy $410.17
38385 CSI/GEOTURF, Inc. $7,842.00
38386 Culligan Water Conditioning $35.35
38387 D R Painting Inc. $1,698.14
38388 Detroit Salt Company LLC $25,905.24
38389 Dic Craven $65.53
38390 Douglas Peck $80.00
38391 Floyd’s Electric Service Inc $245.00
38392 Gary Vandecar $604.71
38393 Gerald Cisler $552.54
38394 Hastings Ace Hardware $50.37
38395 Jack Kineman $552.54
38396 Jake Welch $80.00
38397 Kendall Pranshka $276.28
38398 Kent Oil Company, Inc. $668.57
38399 Kraai Wedd Drilling $100.00
38400 Lakeland Asphalt Corp $724.50
38401 Larry Maupin $604.71
38402 Lawrence Barry $270.00
38403 Mark Weeks $340.00
38404 Michigan Turbo $545.00
38405 Networkfleet, Inc. $3,154.95
38406 Patricia Wolf $276.28
38407 Robert Baines $65.53
38408 Robert Nagel $552.54
38409 Robert Richardson $80.00
38410 Robert Slocum $552.54
38411 Rohr Gasoline Equipment, Inc. $629.24
38412 Scott Bond $80.00
38413 Scott Schantz Jr. $30.00
38414 Spectrum Health – Pennock $720.32
38415 Spotless Auto Lube & Wash $130.40
38416 St. Regis Culvert Inc $7,680.75
38417 State Of Michigan $48.78
38418 State Wire & Terminal $387.10
     
     
Check Number Vendor Name Check Amount
38419 Superior Asphalt Inc $10,000.00
38420 Tom Chaffee $131.04
38421 Verns Repair & Sport $975.96
38422 Wayne Roush $552.54
38423 William Johnston $19.80
38424 Woodland Auto Body $2,610.98
38425 X-Cel Chemical Spec Co $468.48
Sub-Total $95,546.64
Total $289,825.13

 

_____________________________________________________________________________

 

Jake Welch, Director of Operations, and Doug Peck, Operations Engineer, were at the meeting.

 

Mike Powers spoke to the Board about Bay Pointe expansion. A discussion was had about sidewalk and pedestrian crossings. Joe Farley and Joel Kapteyn who live near Bay Point were also at the Board Meeting. Mr. Farley would like the sidewalk to be on the East side of the Road. Mr. Farley also would like to save his Oak Tree from being cut down for the sidewalk.   Mr. Powers said they will abide with the decision of the Board. Mr. Powers also stated that they could work around the Oak Tree. A discussion was had about having two pedestrian crossings within 200-300’ of each other and the safety of the pedestrians with the traffic.

 

Motion was made to have a single pedestrian crossing and to put the sidewalk wherever Mr. Powers and Mr. Farley could agree to have one. The Motion was not seconded.

 

Motion was made and seconded to approve having a sidewalk on the West side of Marsh Road and a single pedestrian crossing. Bay Point is to work with the BCRC Engineering Department for the best place to put the sidewalk.

 

ROLL CALL: Yeas, Solmes, Fiala, & Dykstra

Nays, None

Motion Carried

_____________________________________________________________________________

 

Dave DeHaan from Walker, Fluke, and Sheldon, PLC presented to the Board the 2017 Financial Report. Dave DeHaan reported that the Barry County Road Commission received an unmodified opinion or a “clean” opinion for the audit ending December 31, 2017. This is considered the best or highest level the Road Commission could receive.

 

Motion was made and seconded to accept the 2017 Financial Report.

 

ROLL CALL: Yeas, Solmes, Fiala, & Dykstra

Nays, None

Motion Carried

______________________________________________________________________________

 

Motion was made and seconded authorizing Chairman Solmes to sign the 2017 Act 51 report.

 

ROLL CALL: Yeas, Solmes, Fiala, & Dykstra

Nays, None

Motion Carried

 

 

 

 

 

 

Motion was made and seconded to accept Maple Grove Township Resolution for Road Work.

 

ROLL CALL: Yeas, Solmes, Fiala, & Dykstra

Nays, None

Motion Carried

 

The regular monthly meeting of the Maple Grove Township Board was held on March 7, 2018 with four board members present and one absent.

 

The following motion was made by Ginger Cole supported by Larry Hook to authorize the Barry County Road Commission to make improvements as suggested for the following projects for a total township expense of $59,122.

 

Cloverdale Road                     Edge & Full Slag Seal                         BCRC

2 miles Guy Road to Eaton County Line

Maple Grove Road                 Edge & Full Slag Seal                         BCRC

.18 miles Assyria Road to M-66

Cloverdale Road                     Slag Seal                                             $14,000

1 Mile Guy Road to M-66

Barryville Road                       Crack Seal                                           $3,500

1 Mile Lawrence Road to Bivens Road

Butler Road                            1.5 HMA Overlay & Slag Seal           BCRC

3.01 Miles M-66 Hwy to Eaton County Line

Clark Road                              Edge & Full Slag Seal                         $38,461

2.02 Miles Cloverdale Road to M-79 Hwy

Total Anticipated Paved Road Repairs                                              $55,961

 

Pavement Markings for Barryville Road, Castleton Township to Maple Grove Road; and

Bivens Road, Assyria Road to M-66 for a total                                 $3,161

 

Total 2018 Improvements                                                                   $59,122

 

Once again we as a board appreciate the fine work of the Barry County Road Commission and thank you for your progressive thinking that allows us to make repairs free of charge.

______________________________________________________________________________

 

Motion was made and seconded to accept Prairieville Township Resolution for Road Work.

 

ROLL CALL: Yeas, Solmes, Fiala, & Dykstra

Nays, None

Motion Carried

 

Prairieville Township approved the following funds at the Budget Hearing on March 14, 2018:

 

The Prairieville Township 4 Year Plan Road Repair Recommendations:

 

2018 – $493,304

2019 – $28,161

2020 – $12,340

2021 – $28,823

 

Township payment each year will be $140,657.

 

 

 

 

 

 

 

 

 

Motion was made and seconded to accept Johnstown Township Resolution for Road Work.

 

ROLL CALL: Yeas, Solmes, Fiala, & Dykstra

Nays, None

Motion Carried

 

WHEREAS, the following is a formal record of action taken by the governing body of Johnstown Township (the “Municipality”) with respect to the annual budget adoption for April 1, 2018 to March 31, 2019 to allocate to road repairs and the resolution is hereby adopted:

 

NOW, THEREFORE, BE IT RESOLVED that: Johnstown Township has adopted and approved the following road repairs in Johnstown Township to be completed by the Barry County Road Commission:

Per

Road Name                 Road Segment                                           Recommendation             Twp Cost

Hickory Road             Bridge project to North Ave.              Crack Seal                   $1,855.00

Lacey Road                 Bridge project to North Ave.              Crack Seal                   $8,715.00

Mud Lake Road          Hutchinson Rd East to Twp Line       Crack Seal                   $7,035.00

Pifer Road                   M-37 Hwy to Twp Line                      Crack Seal                   $8,820.00

Hutchinson Road        Lacey Rd to Fruin Rd                         Edge/Full Slag Seal     $29,893.00

Baseline Road             Wabascon Rd East to Twp Line         1.5 HMA Overlay

& Slag Seal                 $73,644.00

Bristol Road

and Winans Road     M-37 Hwy to Hutchinson Rd             Crack Seal                   $6,300.00

Bristol Road                Banfield Rd to M-37 Hwy                 Edge/Full Slag Seal     $26,466.00

Mill Lake Road           M-37 Hwy to Mill Dr                         Slag Seal                     $4,480.00

Baseline Road             Hutchinson Rd to Wabascon Rd        Crack Seal                   $3,535.00

Strickland Road          Hutchinson Rd to Wabascon Rd        Edge/Full Slag Seal     $21,515.00

Pavement Markings    Per Listing less above slag seals          Per attached listings    $3,294.00

Dust Control               Est. Cost for 2 applications                 20.15 mi Single

10.75 mi Double         $12,000.00

Total                                                                                                                            $207,552.00

 

ALSO, BE IT RESOLVED FURTHER: That the authorized signor of the Municipality be, Sheri Babcock, and is hereby, authorized and directed to execute the Plan on behalf of the Municipality;

 

The foregoing resolution offered by Board member Warren and supported by Board Member Powell to be adopted.

______________________________________________________________________________

 

Bids were opened at 10:30 A.M. on April 10, 2018

 

Agricultural Lease 2019 – 2023

 

BIDDER                                              Pit                                   Per acre/year          

 

Derrick Hammond                              Drakes Pit                        $186.00

 

Frederic L. Halbert                             Drakes Pit                          $166.50

 

Larry Ferris                                         Drakes Pit                        $125.00

 

Motion was made and seconded to award the Agricultural Lease bid to Derrick Hammond.

 

ROLL CALL: Yeas, Solmes, Fiala, & Dykstra

Nays, None

Motion Carried

 

 

 

Bituminous Mixtures

 

Bid Items Units Wyoming Asphalt Lakeland Asphalt Michigan Paving & Materials Reith Riley
36A Picked up at the plant ton $46.00 $46.00 $52.50 $55.00
Trucking to NW quadrant ton $7.00 $10.00 $9.25 NO BID
Trucking to NE quadrant ton $7.00 $10.00 $11.25 NO BID
Trucking to SW quadrant ton $7.50 $10.00 $7.50 NO BID
Trucking to SE quadrant ton $7.50 $10.00 $9.25 NO BID
Min. 6 Hr Charge
for Floboy

 

Motion was made and seconded to award the Bituminous Mixtures bid to all bidders and purchase in the best interest of the Barry County Road Commission.

 

ROLL CALL: Yeas, Solmes, Fiala, & Dykstra

Nays, None

Motion Carried

______________________________________________________________________________

 

Crack Sealing Blocks

 

Bid Items Units Surface Coatings Auburn Hills, MI Sherwin Industries, Inc. Milwaukee, WI K-Tech Specialty Coatings South Bend, IN P & T Products Inc Sandusky, OH
Crafco Fiber #34250 PF III lb   $0.4930    
#34244 lb   $0.4530    
#34221 lb   $0.4230    
#34211 lb   $0.4030    
#43518 lb   $0.3830    
KT-3405 lb     $0.4900  
Dura-Fill 3405 lb       $0.4490
RP 3405 Virgin lb $0.4700      
RPAsphalt Rubber Mod lb $0.4500      
RP Polyfiber Firm lb $0.5050      

 

Motion was made and seconded to award the Crack Sealing Block bid to all bidders and purchase in the best interest of the Barry County Road Commission.

 

ROLL CALL: Yeas, Solmes, Fiala, & Dykstra

Nays, None

Motion Carried

 

 

Culverts

 

 

Bid Items Units Contech ES Jensen Bridge Cadillac Culvert Haviland Drainage St. Regis Culvert Advanced Drainage Northern Concrete Core and Main
12″ 16ga CMP – 2oz Zinc-Galv ft $7.50 $6.24 $6.24 NO BID $6.30 NO BID NO BID $6.43
12″x12″ Band 2oz Zinc-Galv ea $10.98 $10.92 $10.00 NO BID $10.45 NO BID NO BID $10.30
15″ 16ga CMP – Aluminized ea $9.98 $9.25 $8.30 NO BID $8.95 NO BID NO BID $8.56
15″X12″ Band – Aluminized ea $15.10 $16.18 $14.15 NO BID $14.80 NO BID NO BID $14.60
18″ 16ga CMP – Aluminized ea $12.75 $11.15 $10.46 NO BID $11.20 NO BID NO BID $10.75
18″X24″ Band – Aluminized ea $19.25 $22.30 $18.35 NO BID $22.40 NO BID NO BID $18.90
24″ 14ga CMP – Aluminized ea $20.15 $14.77 $17.30 NO BID $17.88 NO BID NO BID $17.83
24″X24″ Band – Aluminized ea $30.25 $29.54 $24.30 NO BID $35.70 NO BID NO BID $25.05
12″ SLCPP ea NO BID NO BID NO BID $4.33 NO BID $4.30 NO BID $4.30
12″ SLCPP – Split Coupler ea NO BID NO BID NO BID $5.92 NO BID $5.50 NO BID $5.50
15″ SLCPP ea NO BID NO BID NO BID $5.65 NO BID $5.80 NO BID $5.80
15″ SLCPP – Split Coupler ea NO BID NO BID NO BID $8.49 NO BID $8.45 NO BID $8.45
18″ SLCPP ea NO BID NO BID NO BID $8.59 NO BID $8.40 NO BID $8.40
18″ SLCPP – Split Coupler ea NO BID NO BID NO BID $11.13 NO BID $11.85 NO BID $11.85
24″ SLCPP ea NO BID NO BID NO BID $13.50 NO BID $15.00 NO BID $15.00
24″ SLCPP – Split Coupler ea NO BID NO BID NO BID $17.37 NO BID $20.50 NO BID $20.50
Concrete Class III                
12″ ft             $9.60 $9.60
15″ ft             $12.21 $12.21
18″ ft             $15.21 $15.21
24″ ft             $22.62 $22.62
SLCPP 12″ X 30′ ea NO BID NO BID NO BID $4.33 NO BID $4.30 NO BID $4.30
Core & Main – Price based on full Load – Add 10% for partial Loads
Northern Concrete – Truck load only – Add 10% for partial Loads.
Jenson Bridge – Prices good for 60 days. Terms 1% 10 Days, Net 30
Cadillac Culvert – Prices firm for 60 days. Prices for full truckload. Terms 1% 10 Days, Net 30
St. Regis – Prices firm for 30 days from bid date.
Advance Drain – No Freight if P.U. – No Freight for orders > %5,000 -$300 for $2,500 to $4,999 – $500 < $2,500
Contech – Prices good for 90 days, subject to changes in raw mat cost. Full truckload or $300 freight.

 

Motion was made and seconded to award the Culvert bid to Haviland Drainage for Plastic Culvert, Galvanized and Aluminized Culvert to Cadillac Culvert and Concrete Culvert in the best interest of the Barry County Road Commission.

 

ROLL CALL: Yeas, Solmes, Fiala, & Dykstra

Nays, None

Motion Carried

Dust Control

 

Michigan S & M
Chloride Liquid
Sales, LLC Tire Fill, Inc.
Mineral Well Brine Mineral Well Brine
Min % dust palliative 26.0%(W/V) 14.80%
Calcium Chloride 19.0% (W/V) 2.90%
Magnesium Chloride 3.0% (W/V) 2.90%
Other: 0.9% (W/V) 0.19%
Sodium Chloride Max 5.0% (W/V) 9.61%
Specific gravity 1.27 1.23
Notes 9,500 gal min load
Net 30
Assyria No Bid $0.1050
Barry No Bid $0.1200
Carlton No Bid $0.1300
Castleton $0.1730 $0.1400
Hope $0.1730 $0.1400
Irving $0.1730 $0.1400
Johnstown No Bid $0.1400
Orangeville $0.1730 $0.1400
Prairieville No Bid $0.1300
Thornapple $0.1730 $0.1400
Woodland $0.1730 $0.1400
Yankee Springs No Bid $0.1300

 

 

Motion was made and seconded to award the Dust Control bid to all bidders and purchase in the best interest of the Township.

 

ROLL CALL: Yeas, Solmes, Fiala, & Dykstra

Nays, None

Motion Carried

_________________________________________________________________________________________

 

Pavement Markings

 

Bidders                                               4” White Line            4” Yellow Line           Total

PK Contracting                                   $17,200.00                  $17,200.00                  $34,400.00

M & M Pavement Marking                 $16,000.00                  $16,000.00                  $32,000.00

Michigan Pavement Markings            $16,000.00                  $16,000.00                  $32,000.00

RS Contracting, Inc.                           $22,000.00                  $22,000.00                  $44,000.00

 

Motion was made and seconded to table the Pavement Marking bid until Federal Aid Pavement Marking bid is completed.

 

ROLL CALL: Yeas, Solmes, Fiala, & Dykstra

Nays, None

Motion Carried

 

 

 

 

 

 

 

Scraper Blades

 

Bid Items Units Winter Eq. Willoughby, OH Michigan CAT Lansing, MI Nordik Blades Asbestos, QC St. Regis Charlotte, MI Truck & Trailer Dutton, MI
3/4″x8″x72″                  SCRAPER BLADES   PU or Del. PU or Del Delivered PU or Del PU or Del
  Dbl bvl Alt   Prices    
QTY: 250-500            
3 Months ea $85.48 $87.04 $92.69 $91.20 $98.30
6 Months ea $85.48 $87.04 $94.43   $98.30
12 Months ea $85.48 $87.04 $96.19   $98.30
QTY: 500-1000            
3 Months ea $85.48 $87.04 $90.54 $91.20 $97.37
6 Months ea $85.48 $87.04 $92.28   $97.37
12 Months ea $85.48 $87.04 $94.01   $97.37
QTY: 1000-1500            
3 Months ea $85.48 $87.04 $87.59 $91.20 $96.90
6 Months ea $85.48 $87.04 $89.22   $96.90
12 Months ea $85.48 $87.04 $90.88   $96.90
QTY: 1500-2000            
3 Months ea $85.48 $87.04 $84.83 $91.20 $96.43
6 Months ea $85.48 $87.04 $86.41   $96.43
12 Months ea $85.48 $87.04 $88.01   $96.43
Bid Items Units Winter Eq. Willoughby, OH Michigan CAT Lansing, MI Nordik Blades Asbestos, QC St. Regis Charlotte, MI Truck & Trailer Dutton, MI
3/4″x8″x72″                 SERRATED BLADES   3-4 wk del   SINGLE    
      BEVEL    
QTY: 0-250            
3 Months ea $97.97 $102.30 $107.69 $115.80 $93.81
6 Months ea $97.97 $102.30 $109.72   $93.81
12 Months ea $97.97 $102.30 $111.79   $93.81
QTY: 250-500            
3 Months ea $97.97 $102.30 $104.69 $115.80 $92.91
6 Months ea $97.97 $102.30 $106.66   $92.91
12 Months ea $97.97 $102.30 $108.67   $92.91
             
             
             
             
QTY: 500-1000            
3 Months ea $97.97 $102.30 $101.68 $115.80 $92.47
6 Months ea $97.97 $102.30 $103.60   $92.47
12 Months ea $97.97 $102.30 $105.54   $92.47
QTY: 1000-1500            
3 Months ea $97.97 $102.30 $99.53 $115.80 $92.02
6 Months ea $97.97 $102.30 $101.40   $92.02
12 Months ea $97.97 $102.30 $103.31   $92.02
Bid Items Units Winter Eq. Willoughby, OH Michigan CAT Lansing, MI Nordik Blades Asbestos, QC St. Regis Charlotte, MI Truck & Trailer Dutton, MI
3/4″x8″x84″                         GRADER BLADES            
           
QTY: 1-50            
3 Months ea $129.34 $100.43 $108.14 $106.40 $110.67
6 Months ea $129.34 $100.43 $110.17   $110.67
12 Months ea $129.34 $100.43 $112.23   $110.67
QTY: 50-100            
3 Months ea $129.34 $100.43 $105.69 $106.40 $109.61
6 Months ea $129.34 $100.43 $107.66   $109.61
12 Months ea $129.34 $100.43 $109.67   $109.61
QTY: 100 – 500            
3 Months ea $129.34 $100.43 $102.19 $106.40 $109.09
6 Months ea $129.34 $100.43 $104.09   $109.09
12 Months ea $129.34 $100.43 $106.03   $109.09
QTY: 500-1000            
3 Months ea $129.34 $100.43 $98.97 $106.40 $108.56
6 Months ea $129.34 $100.43 $100.81   $108.56
12 Months ea $129.34 $100.43 $102.68   $108.56
Winter Eq – Quoted Heat Treated Double Bevel as an alternative
Winter Eq. – $120 delivery charge on less than 50 blade orders
St Regis – Prices Firm for 30 days from Bid Date

 

 

Motion was made and seconded to award the Scraper Blade bid to Michigan Cat.

 

ROLL CALL: Yeas, Solmes, Fiala, & Dykstra

Nays, None

Motion Carried

 

 

 

 

 

Signs

 

Bid Items Units Osburn Associates Inc. Dornbos Signs, Inc Rathco Supply Hall Signs Lightle Enterp.
R1-1 Stop – 30″ ea $21.95 $22.76 $24.76 $27.66 $28.50
R1-1 Stop – 36″ ea $34.92 $33.00 $35.57 $40.75 $41.50
R1-2 Yield – 36″ ea $17.46 $17.87 $18.43 $22.76 $21.83
R2-1 Speed Limit – 24″x30″ ea $19.40 $19.85 $20.95 $22.28 $24.25
W Series Warning – 30″ B on Y ea $24.24 $24.81 $26.19 $31.39 $30.31
W Series Warning – 36″ B on Y ea $34.92 $35.73 $37.71 $42.28 $43.65
W1 (6 or 7) T. Arrow – 48″x24″ ea $31.04 $31.76 $33.52 $38.88 $38.80
W1-8 Chevron – 18″x24″ ea $11.64 $11.91 $12.57 $14.17 $14.55
W3-1 Stop Ahead Symbol – 30″ ea $24.88 $27.24 $28.92 $36.40 $32.35
W3-1 Stop Ahead Symbol – 36″ ea $35.82 $39.16 $41.94 $49.43 $46.95
W13-1 Adv. Speed – 18″x18″ ea $8.96 $8.93 $9.45 $11.09 $10.91
Road Name Blank – 9″x24″ ea $12.36 $9.23 No Bid $12.77 $10.46
Road Name Blank – 9″x30″ ea $15.45 $11.56 No Bid $15.23 $13.07
Road Name Blank – 9″x36″ ea $18.54 $13.84 No Bid $17.86 $15.68
Road Name Blank – 9″x42″ ea $21.59 $16.17 No Bid $20.32 $18.30

 

Motion was made and seconded to award the Traffic Control Sign bid to Dornbos Signs.

 

ROLL CALL: Yeas, Solmes, Fiala, & Dykstra

Nays, None

Motion Carried

______________________________________________________________________________

 

 

Meeting adjourned at 9:40 A.M.

 

 

 

 

 

 

 

 

 

 

 

 

 

_________________________________                   __________________________________

Chairman                                                                     Secretary